Home
About Us
Products
Case
News
Contact Us
EN
RU
About Us
History
Certificate
Structure
LinSen
Group
development
history
2023
*Zhuhai Linsen Purification Group Co.,Ltd set up as fifth centralized-manufacturer base *Develop outdoor cleanroom window
2022
*Chengdu Linsen Purification Group Co.,Ltd set up as fourth centralized-manufacturer base *Develop BiBo, VHP passbox, Mist Shower, bio air tight door
2020
*Suzhou Rongsen Air Purification Engineering Co.,Ltd set up with Class A engineering service to provide MEP with process machine *Get Biosafety-Lab-three project in Egypt
2019
Get AstraZeneca and MSD project in Australia
2018
*He Nan Pharmaceutical Design Institute Co.,Ltd (Suzhou branch) set up as design center *Get the first project in USA which pass FDA and against earthquake
2017
Line-Link Purification Technology (Shanghai) Co.,Ltd set up as overseas center
2017
Suzhou Fresh Air Purification Technology Co.,Ltd set up as manufacturer for stainless steel products and filters
2017
*Import Italian full automatic CNC machine to produce door *Set up own rockwool factory to support cleanroom panel
2013
*Suzhou Linsen Air Purification Engineering Co.,Ltd can provide MEP work *Set up own tempered glass factory for window using
2012
Suzhou Linsen Machinery Co.,Ltd set up and produce clenroom windows and doors.
2011
Tianjin Linsen Purification Group Co.,Ltd set up as second centralized-manufacturer base
2008
Set up domestic sales centers in Beijing, Tianjin, Shanghai, Suzhou, Wuhan.
2006
*Suzhou Linsen Purification Group Co.,Ltd set up as first centralized-manufacturer base *Have full automatic production line for cleanroom panel
2003
Suzhou Linsen Air Purification Engineering Co.,Ltd set up in Wujiang city